    • Solina Dam
    • The Żarnowiec hydropower plant
    • Dychów hydropower plants
    • Żelazny Most tailing dam
    • Porąbka-Żar power plant
    • The Malczyce Barrage
    • Świnna – Poręba dam
    • Bełchatów Coal Mine
    • Myczkowce dam
    • Wióry dam
    • Pilchowice dam
    • Katowice Shopping Mall
    • Lubachów dam
    • Czchów hydropower plant
    • Rożnów hydropower plant
    • Fiber optic mat – installation
    • Inclinometric monitoring of diaphragm walls
    • PSH Żydowo
    • The ISMOP Czernichów Project
    • Turów brown coal mine
  • About Us
  • Contact Us
  • Polski
  • English

Category: Projects

The ISMOP Czernichów project has first of its kind monitoring system implemented by BUDOKOP Ltd. System uses IT data and allows to view it throuh SCADA.

The ISMOP Czernichów Project

The ISMOP Czernichów Project (IT Flood Monitoring System) was aimed at developing a flood monitoring system. Condition of groundwater flood […]

Geotechnics, Projects, thermomonitoring ASTKZ, Budokop, Czernichów, Flood monitoring, ISMOP, Monitoring, SCADA
Kopalnia Węgla Brunatnego.

Turów brown coal mine

In 2017 and 2018, BUDOKOP designed and constructed for PGE GiEK S.A. Turów Brown Coal Mine Department an installation of […]

Geotechnics, Projects Brown coal mine, dumping ground monitoring, SAAV, Turów
Monitoring Inklinometryczny.

Inclinometric monitoring of diaphragm walls

Effective inclinometer monitoring is essential when conducting deep foundation works. Urban areas where the boundaries of the investment are often […]

Construction, inclinometric monitoring, Projects diaphragm walls, Inclinometer, inclinometer monitoring
Mata Światłowodowa

Fiber optic mat – installation

In years 2006-2008 Budokop has taken part in scientific project „Distributed and Polymer Optical Fibre Sensors”. The goal of the […]

Projects, thermomonitoring BAM, Berlin Federal Institute of Materials Research and Testing
PSH Zydowo

PSH Żydowo

In 2019, we carried out the construction and executive design of the Automatic Technical Dam Control System for the pumped […]

Hydrotechnics, Projects Automatic system of technical dam control, capacitive probes, Hydrostatic probes, piezometers

Wióry dam

Wióry dam [RZGW Warszawa] System of reservoirs Brody Iłżeckie – Wióry. It is an earth dam with a core and […]

Hydrotechnics, Projects ASTKZ, piezometers, Technical Dam Control, Wióry dam
Świnna - Poręba dam is an earth dam with a core supplemented with sensors installed by BUDOKOP. The Dam is located at the Skava river.

Świnna – Poręba dam

Świnna – Poręba dam [RZGW Kraków] The Świnna Poręba dam is built at the Skawa river. It is an earth […]

Hydrotechnics, Projects Dam core, Skawa river, Świnna - Poręba dam
Bełchatów coal mine is the largest coal pit mine in Poland. BUDOKOP Ltd, had installed AWID devices and inplemented deep inclinometers in the facility.

Bełchatów Coal Mine

KWB Bełchatów PGE Górnictwo i Energetyka Konwencjonalna S.A.] KWB Bełchatów – Bełchatów Coal Mine is the largest open pit mine in […]

Geotechnics, Projects AWID, Bełchatów Coal Mine
Myczkowce Dam is an earth Dam with a core. BUDOKOP Ltd. has implemented an ASTKZ devices throughout the dam in year 2006.

Myczkowce dam

Myczkowce dam [PGE Energia Odnawialna S.A. ZEW division Solina – Myczkowce] The Myczkowce dam is an earth dam with a core. […]

Hydrotechnics, Projects ASTKZ, Automatic system of technical dam control, Myczkowce dam, piezometer
Czchów hydropower plant belongs to The Cracow Complex of Hydropowerplants. BUDOKOP Ltd. has installed ASTKZ with a standard set of sensors.

Czchów hydropower plant

EW Czchów [TAURON Ekoenergia] The Complex of hydropower plants of Cracow consist among all of the Rożnów hydropower plant and […]

Hydrotechnics, Projects Czchów hydropower plant.

Posts navigation

Older posts

Recent Posts

  • The ISMOP Czernichów Project
  • Turów brown coal mine
  • Inclinometric monitoring of diaphragm walls
  • Fiber optic mat – installation
  • PSH Żydowo

Website

(C) Budokop 1996-2020

All rights Reserved

Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Polityka prywatności

WWW created by bezdroza4x4.pl

Translator