Solina Dam

During over 20 years of activity, we have implemented many interesting and difficult projects.

Below are selected projects:

Hydrotechnics – these are mainly Automatic Systems for Technical Dam Control.



Geotechnics – these are mainly the largest geotechnical facilities in Poland (BCM Bełchatów, BCM Turów, post-flotation waste tank – Żelazny Most, KGHM) we install deep inclinometers and other measuring equipment in deep boreholes on these objects. We also implement fully automatic measuring systems.


Thermal monitoring – mainly installations of fiber optic sensory cable for measuring water filtration (active temperature measurement) or measuring deep displacement of the rock mass (stress measurement).


Construction – mainly inclinometric measurements of diaphragm walls and measurements of water pore pressure.