Skip to content
Budokop

Budokop

Zakład projektowo-produkcyjno-usługowo-handlowy

  • Menu
    • Hydrotechnics
    • Constructions
    • Geotechnics
    • Thermal monitoring
    • Inclinometric measurements
    • Measurement devices
  • Projects
    • Projects
    • Solina Dam
    • The Żarnowiec hydropower plant
    • Dychów hydropower plants
    • Żelazny Most tailing dam
    • Porąbka-Żar power plant
    • The Malczyce Barrage
    • Świnna – Poręba dam
    • Bełchatów Coal Mine
    • Myczkowce dam
    • Wióry dam
    • Pilchowice dam
    • Katowice Shopping Mall
    • Lubachów dam
    • Czchów hydropower plant
    • Rożnów hydropower plant
    • Fiber optic mat – installation
    • Inclinometric monitoring of diaphragm walls
    • PSH Żydowo
    • The ISMOP Czernichów Project
    • Turów brown coal mine
  • About Us
  • Contact Us
  • Polski
  • English

Category: Hydrotechnics

PSH Zydowo

PSH Żydowo

In 2019, we carried out the construction and executive design of the Automatic Technical Dam Control System for the pumped […]

Hydrotechnics, Projects Automatic system of technical dam control, capacitive probes, Hydrostatic probes, piezometers

Wióry dam

Wióry dam [RZGW Warszawa] System of reservoirs Brody Iłżeckie – Wióry. It is an earth dam with a core and […]

Hydrotechnics, Projects ASTKZ, piezometers, Technical Dam Control, Wióry dam
Świnna - Poręba dam is an earth dam with a core supplemented with sensors installed by BUDOKOP. The Dam is located at the Skava river.

Świnna – Poręba dam

Świnna – Poręba dam [RZGW Kraków] The Świnna Poręba dam is built at the Skawa river. It is an earth […]

Hydrotechnics, Projects Dam core, Skawa river, Świnna - Poręba dam
Myczkowce Dam is an earth Dam with a core. BUDOKOP Ltd. has implemented an ASTKZ devices throughout the dam in year 2006.

Myczkowce dam

Myczkowce dam [PGE Energia Odnawialna S.A. ZEW division Solina – Myczkowce] The Myczkowce dam is an earth dam with a core. […]

Hydrotechnics, Projects ASTKZ, Automatic system of technical dam control, Myczkowce dam, piezometer
Czchów hydropower plant belongs to The Cracow Complex of Hydropowerplants. BUDOKOP Ltd. has installed ASTKZ with a standard set of sensors.

Czchów hydropower plant

EW Czchów [TAURON Ekoenergia] The Complex of hydropower plants of Cracow consist among all of the Rożnów hydropower plant and […]

Hydrotechnics, Projects Czchów hydropower plant.
Lubachów dam belongs to Wałbrzych Complex of Hydropower Plants. Built in 1917 at the Bystrzyca river and enriched with BUDOKOP's Ltd. ASTKZ in 2012.

Lubachów dam

Lubachów dam [TAURON Ekoenergia] The power plant is the part of the Wałbrzych Hydropower Plant Complex . The dam was […]

Hydrotechnics, Projects ASTKZ, digital tilt meters, Lubachów dam, piezometers, Wałbrzych Hydropower plant complex
In 2013 BUDOKOP Ltd designed and installed  the Automatic System of Technical Dam Control (ASTKZ) at the Pilchowice hydropower plant.

Pilchowice dam

Pilchowice dam [TAURON Ekoenergia] The Pilchowice Dam – Pilchowice I hydropower plant The power plant is the part of The […]

Hydrotechnics, Projects ASTKZ, Pilchowice dam, sensors
Różnów hydropower plant belongs to Cracow Complex of Hydropowerplants along with Czchów facility. BUDOKOP Ltd. has implemented ASTKZ in both.

Rożnów hydropower plant

Rożnów hydropower plant – the complex of hydropower plants of Cracow [TAURON Ekoenergia] Cracow hydropower plant complex consists among all […]

Hydrotechnics, Projects ASTKZ, Complex of hydropower planst of Cracow, roznow hydropower plant, TAURON
BUDOKOP installed sensors in the foundations of the power plant as well under the ferroconcrete structure of the weir at the Malczyce Barrage.

The Malczyce Barrage

[RZGW Wrocław] This is another element of the existing cascade of the Odra Waterway. The main purpose of its construction […]

Hydrotechnics, Projects malczyce barrage
Automatic System of Technical Dam Control (ASTKZ) in The Żarnowiec hydropower plant was implemented by BUDOKOP in the years 2001 – 2004.

The Żarnowiec hydropower plant

[PGE Energia Odnawialna S.A.] The Żarnowiec hydropower plant – The highest pumped storage power plant in Poland (716 MW). The […]

Hydrotechnics, Projects ASTKZ, hydropower plant, piezometers, Żarnowieckie lake

Posts navigation

Older posts

Recent Posts

  • The ISMOP Czernichów Project
  • Turów brown coal mine
  • Inclinometric monitoring of diaphragm walls
  • Fiber optic mat – installation
  • PSH Żydowo

Website

(C) Budokop 1996-2020

All rights Reserved

Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Polityka prywatności

WWW created by bezdroza4x4.pl

Translator