Skip to content
Budokop

Budokop

Zakład projektowo-produkcyjno-usługowo-handlowy

  • Menu
    • Hydrotechnics
    • Constructions
    • Geotechnics
    • Thermal monitoring
    • Inclinometric measurements
    • Measurement devices
  • Projects
    • Projects
    • Solina Dam
    • The Żarnowiec hydropower plant
    • Dychów hydropower plants
    • Żelazny Most tailing dam
    • Porąbka-Żar power plant
    • The Malczyce Barrage
    • Świnna – Poręba dam
    • Bełchatów Coal Mine
    • Myczkowce dam
    • Wióry dam
    • Pilchowice dam
    • Katowice Shopping Mall
    • Lubachów dam
    • Czchów hydropower plant
    • Rożnów hydropower plant
    • Fiber optic mat – installation
    • Inclinometric monitoring of diaphragm walls
    • PSH Żydowo
    • The ISMOP Czernichów Project
    • Turów brown coal mine
  • About Us
  • Contact Us
  • Polski
  • English

Category: Projects

Lubachów dam belongs to Wałbrzych Complex of Hydropower Plants. Built in 1917 at the Bystrzyca river and enriched with BUDOKOP's Ltd. ASTKZ in 2012.

Lubachów dam

Lubachów dam [TAURON Ekoenergia] The power plant is the part of the Wałbrzych Hydropower Plant Complex . The dam was […]

Hydrotechnics, Projects ASTKZ, digital tilt meters, Lubachów dam, piezometers, Wałbrzych Hydropower plant complex
Katowice Shopping Mall was built as a part of renovation project together with the Railway Station and Bus station in Katowice. Check BUDOKOP's part in this

Katowice Shopping Mall

Katowice Shopping Mall was built together with the modernisation of the Railway Station and the Bus Station in Katowice. Together […]

Construction, Geotechnics, Projects foundations, Katowice, Katowice Bus Station, Katowice Railway Station, Katowice Shopping Mall, water pressure measurement
In 2013 BUDOKOP Ltd designed and installed  the Automatic System of Technical Dam Control (ASTKZ) at the Pilchowice hydropower plant.

Pilchowice dam

Pilchowice dam [TAURON Ekoenergia] The Pilchowice Dam – Pilchowice I hydropower plant The power plant is the part of The […]

Hydrotechnics, Projects ASTKZ, Pilchowice dam, sensors
Różnów hydropower plant belongs to Cracow Complex of Hydropowerplants along with Czchów facility. BUDOKOP Ltd. has implemented ASTKZ in both.

Rożnów hydropower plant

Rożnów hydropower plant – the complex of hydropower plants of Cracow [TAURON Ekoenergia] Cracow hydropower plant complex consists among all […]

Hydrotechnics, Projects ASTKZ, Complex of hydropower planst of Cracow, roznow hydropower plant, TAURON
BUDOKOP installed sensors in the foundations of the power plant as well under the ferroconcrete structure of the weir at the Malczyce Barrage.

The Malczyce Barrage

[RZGW Wrocław] This is another element of the existing cascade of the Odra Waterway. The main purpose of its construction […]

Hydrotechnics, Projects malczyce barrage
Automatic System of Technical Dam Control (ASTKZ) in The Żarnowiec hydropower plant was implemented by BUDOKOP in the years 2001 – 2004.

The Żarnowiec hydropower plant

[PGE Energia Odnawialna S.A.] The Żarnowiec hydropower plant – The highest pumped storage power plant in Poland (716 MW). The […]

Hydrotechnics, Projects ASTKZ, hydropower plant, piezometers, Żarnowieckie lake
Solina Dam is the highest hydrological structure in Poland in which BUDOKOP Ltd. has implemented ASTKZ that BUDOKOP services to this day.

Solina Dam

[PGE Energia Odnawialna S.A.  – ZEW division Solina – Myczkowce] The Solina dam is the largest hydrological structure in Poland, 664 […]

Hydrotechnics, Projects ASTKZ, Budokop, dam, ENERGOEFEKT, GLOETZL, solina
Żelazny Most has deep inclinometers installed since year 2007 and has now reached 6000m. Inclinometers are installed and serviced by BUDOKOP Ltd.

Żelazny Most tailing dam

Żelazny Most [KGHM]- tailing dam Żelazny Most Tailing damhas deep inclinometers installed by BUDOKOP Ltd to monitor the slope resistance. Since […]

Hydrotechnics, Projects dam, inclinometers, kghm, tailng dam
Dychów hydropower plant has ASTKZ system implemented in 1998 and serviced by BUDOKOP Ltd. Also in year 2011 the system was modernised.

Dychów hydropower plants

The Dychów hydropower plants [PGE Energia Odnawialna S.A.] The Dychów power plant is a pumped storage power plant. The largest […]

Hydrotechnics, Projects ASTKZ, Budokop, derivation canal, hydropower plant, zew dychow
Porąbka - Żar power plant is the only underground power plant in Poland. BUDOKOP Ltd. has instaled Automatic Measuring System in 1994.

Porąbka-Żar power plant

The Porabka pumped storage power plant [PGE Energia Odnawialna S.A.] – Porąbka – Żar power plant is the only underground […]

Hydrotechnics, Projects Automatic Measurement System, Budokop, power, underground power plant

Posts navigation

Newer posts

Recent Posts

  • The ISMOP Czernichów Project
  • Turów brown coal mine
  • Inclinometric monitoring of diaphragm walls
  • Fiber optic mat – installation
  • PSH Żydowo

Website

(C) Budokop 1996-2020

All rights Reserved

Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Polityka prywatności

WWW created by bezdroza4x4.pl

Translator